D&J Utility Services was contracted by the City of Kingsville for the integration of a 230 kW diesel generator at wet well #14. This project addresses the critical need for operational resiliency within their wastewater collection system.


The installation included the full scope of work required to provide a robust standby power solution, ensuring continued lift station functionality during grid outages. This strategic upgrade enhances the system's reliability and prevents service interruptions, a key consideration for municipal infrastructure.


Our team's technical execution of this project underscores our capability in delivering high-level, specialized power solutions that meet the demanding requirements of municipal utility operations.



 
 
 